Seventh Avenue West Corridor

Project Update, July 2025:

Construction of this route is underway! For construction information and updates, visit this page on the City's main website.


Improvements to Seventh Avenue are planned between 10th Street and the existing BC Parkway between 21st and 22nd streets. 

This 2.6 km corridor provides access to Moody Park, Lord Kelvin Elementary School, shops and services on 12th Street, Grimston Park, 22nd Street SkyTrain Station, and the BC Parkway. The corridor also connects to the Queensborough Bridge and the pedestrian and cycling overpass across Stewardson Way and is part of TransLink’s Major Bikeway Network.

The proposed improvements for this corridor will build on the existing measures to slow down traffic and make it safer and more comfortable for people of all ages and abilities to walk and cycle.

Click here to view a larger version.

Proposed Improvements

(Click on the images below to view a larger version)

  1. Local Street Bikeway from 10th-20th streets: Bicycles share the roadway with vehicles
  • Traffic calming: 
  • Speed humps 
  • Curb extensions


2. Protected bike lane from 20th Street to the BC Parkway:

  • Install quick-build, flexible delineator posts
  • 25 on-street parking spaces removed, including:
  • →24 on the north side of Seventh Avenue from 20th Street to 22nd Street
  • →One co-op / shared parking space on the south side of Seventh Avenue by the new crosswalk in front of the SkyTrain station
  • New crosswalk at 21st Street with accessible ramps
  • Relocate crosswalk currently at station stair entrance, moving it west to the station accessible ramp entrance.


Who’s Listening? 

Stacy Lee

Transportation Engineer

Email transportation@newwestcity.ca

Phases

Phases overview
Phase 2: Draft designs developed
Draft designs developed
Phase 3: Community Engagement
Community Engagement
Phase 4: Engagement reporting and design refinement
Engagement reporting and design refinement

Construction

May 1, 2025 7:00 a.m. - No end date

Construction for Boyd Street, Seventh Ave and Seventh Street corridors begins summer, 2025.


Project Update, July 2025: 

Construction of the Seventh Street, Boyd Street, and Seventh Avenue West routes is planned to start in summer 2025. Visit the City's main website for construction information and updates on these projects: